Lime silos tower for pulp and paper factory


Place:

Sweden

Factory product:

Construction steel

Scope of supply:

Manufacturing, delivery and installation on site

Description:

Manufacturing process was done according to EN 1090 EXC2 standard. Steel surface prepared according P2 class and welded using MAG 135 process (B level welding).

For surface treatment there were used airless wet painting according SSG standard. After delivery it was installed by ERCON staff on site. Product was tested by our inhouse quality inspector according NDT (non-destructive testing) requirements.  